Site Operations 2024-2026

Site Logs.

01. Highway & Infra

Completed

NH-44 Elevated Deck

Madurai-Salem Corridor

LOG_#882

Supply of 450+ high-grade pre-stressed box girders and support columns.

M60 GradeIRC:112
In Progress

Railway Overbridge

Tirunelveli Junction

LOG_#901

Modular retaining wall systems and specialized rail sleepers.

RDSO ApprovedPhase II

02. Industrial Units

Completed

Logistics Hub Alpha

Tuticorin Port Road

LOG_#742

Industrial skeleton using precast columns and hollow-core slabs.

High LoadM40 Cast
Completed

Power Grid Wall

Neyveli Substation

LOG_#612

Fire-rated blast walls and heavy duty cable trench modules.

Blast RatedCustom Cast

03. Urban & Smart City

Ongoing // CBE
Coimbatore Barrier Site

Urban Lane Segregators

Coimbatore Smart City Project

LOG_#CBE_991

Mass deployment of low-profile interlocking barriers for safety medians. Engineered for rapid installation in high-density urban corridors.

Safety-Grade Interlocking
Coastal Defense
Precast Tetrapod Coastal Project

Marine Breakwater

Coastal Infrastructure Port Log

LOG_#MAR_772

Production of high-density precast tetrapods for wave energy dissipation. Designed to interlock and provide stable protection for shorelines and port walls.

Anti-Corrosive Mix High-Density