Site Operations 2024-2026
Site Logs.
01. Highway & Infra
Completed
NH-44 Elevated Deck
Madurai-Salem Corridor
Supply of 450+ high-grade pre-stressed box girders and support columns.
M60 GradeIRC:112
In Progress
Railway Overbridge
Tirunelveli Junction
Modular retaining wall systems and specialized rail sleepers.
RDSO ApprovedPhase II
02. Industrial Units
Completed
Logistics Hub Alpha
Tuticorin Port Road
Industrial skeleton using precast columns and hollow-core slabs.
High LoadM40 Cast
Completed
Power Grid Wall
Neyveli Substation
Fire-rated blast walls and heavy duty cable trench modules.
Blast RatedCustom Cast
03. Urban & Smart City
Ongoing // CBE
Urban Lane Segregators
Coimbatore Smart City Project
Mass deployment of low-profile interlocking barriers for safety medians. Engineered for rapid installation in high-density urban corridors.
Safety-Grade
Interlocking
Coastal Defense
Marine Breakwater
Coastal Infrastructure Port Log
Production of high-density precast tetrapods for wave energy dissipation. Designed to interlock and provide stable protection for shorelines and port walls.
Anti-Corrosive Mix
High-Density